{"id":2067,"date":"2026-08-08T16:24:00","date_gmt":"2026-08-08T08:24:00","guid":{"rendered":"https:\/\/www.jzzmade.com\/?p=2067"},"modified":"2026-08-08T16:24:00","modified_gmt":"2026-08-08T08:24:00","slug":"key-technical-points-for-installing-pvc-coated-steel-sheet-piles-following-the-demolition-of-old-retaining-walls-during-the-renovation-of-an-old-river-channel","status":"publish","type":"post","link":"https:\/\/www.jzzmade.com\/fr\/key-technical-points-for-installing-pvc-coated-steel-sheet-piles-following-the-demolition-of-old-retaining-walls-during-the-renovation-of-an-old-river-channel\/","title":{"rendered":"Key Technical Points for Installing PVC-Coated Steel Sheet Piles Following the Demolition of Old Retaining Walls During the Renovation of an Old River Channel"},"content":{"rendered":"<p>After the demolition of old riverbank revetments during the renovation of historic river channels, the sites generally exhibit issues such as significant soil disturbance, thick layers of silt, residual construction debris, and frequent water level fluctuations. These conditions can easily lead to problems such as displacement of plastic-steel sheet piles, poor interlocking, subsequent seepage, and slope settlement. To ensure the effectiveness of riverbank support and waterproofing, construction must strictly control key points throughout the entire process and adapt to the complex conditions of historic river channels.<\/p>\n<p>Prior to construction, the site must undergo thorough preparation to completely remove hard debris\u2014such as gravel and old pile foundations\u2014from the pile locations, thereby preventing pile misalignment and damage to the interlocking joints. For soft silt layers, address the issue by replacing and compacting the soil or extending the pile length to ensure the piles are embedded in a stable soil layer. At the same time, level the construction platform and inspect utility lines and existing structures surrounding the protection area to mitigate potential risks from construction disturbances. High-quality plastic-steel sheet piles compliant with national standards must be selected, with priority given to those equipped with water-swelling waterstop seals. Upon arrival, the integrity of the piles, interlocking joints, and waterstop fittings must be strictly inspected to prevent substandard materials from entering the site.<\/p>","protected":false},"excerpt":{"rendered":"<p>After the demolition of old riverbank revetments during the renovation of historic river channels, the sites generally exhibit issues such as significant soil disturbance, thick layers of silt, residual construction debris, and frequent water level fluctuations. These conditions can easily lead to problems such as displacement of plastic-steel sheet piles, poor interlocking, subsequent seepage, and [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":1869,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[5],"tags":[],"class_list":["post-2067","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-knowledge"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.1 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Key Technical Points for Installing PVC-Coated Steel Sheet Piles Following the Demolition of Old Retaining Walls During the Renovation of an Old River Channel - shandong Jzz Made Co.\uff0cLtd.<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.jzzmade.com\/fr\/key-technical-points-for-installing-pvc-coated-steel-sheet-piles-following-the-demolition-of-old-retaining-walls-during-the-renovation-of-an-old-river-channel\/\" \/>\n<meta property=\"og:locale\" content=\"fr_FR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Key Technical Points for Installing PVC-Coated Steel Sheet Piles Following the Demolition of Old Retaining Walls During the Renovation of an Old River Channel - shandong Jzz Made Co.\uff0cLtd.\" \/>\n<meta property=\"og:description\" content=\"After the demolition of old riverbank revetments during the renovation of historic river channels, the sites generally exhibit issues such as significant soil disturbance, thick layers of silt, residual construction debris, and frequent water level fluctuations. These conditions can easily lead to problems such as displacement of plastic-steel sheet piles, poor interlocking, subsequent seepage, and [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.jzzmade.com\/fr\/key-technical-points-for-installing-pvc-coated-steel-sheet-piles-following-the-demolition-of-old-retaining-walls-during-the-renovation-of-an-old-river-channel\/\" \/>\n<meta property=\"og:site_name\" content=\"shandong Jzz Made Co.\uff0cLtd.\" \/>\n<meta property=\"article:published_time\" content=\"2026-08-08T08:24:00+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.jzzmade.com\/wp-content\/uploads\/2026\/03\/IMG_20260226_115637-scaled.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1920\" \/>\n\t<meta property=\"og:image:height\" content=\"2560\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"admin\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"\u00c9crit par\" \/>\n\t<meta name=\"twitter:data1\" content=\"admin\" \/>\n\t<meta name=\"twitter:label2\" content=\"Dur\u00e9e de lecture estim\u00e9e\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.jzzmade.com\\\/key-technical-points-for-installing-pvc-coated-steel-sheet-piles-following-the-demolition-of-old-retaining-walls-during-the-renovation-of-an-old-river-channel\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.jzzmade.com\\\/key-technical-points-for-installing-pvc-coated-steel-sheet-piles-following-the-demolition-of-old-retaining-walls-during-the-renovation-of-an-old-river-channel\\\/\"},\"author\":{\"name\":\"admin\",\"@id\":\"https:\\\/\\\/www.jzzmade.com\\\/#\\\/schema\\\/person\\\/d7e54f66316f62ccf41d02c644cf31c1\"},\"headline\":\"Key Technical Points for Installing PVC-Coated Steel Sheet Piles Following the Demolition of Old Retaining Walls During the Renovation of an Old River Channel\",\"datePublished\":\"2026-08-08T08:24:00+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.jzzmade.com\\\/key-technical-points-for-installing-pvc-coated-steel-sheet-piles-following-the-demolition-of-old-retaining-walls-during-the-renovation-of-an-old-river-channel\\\/\"},\"wordCount\":245,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/www.jzzmade.com\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.jzzmade.com\\\/key-technical-points-for-installing-pvc-coated-steel-sheet-piles-following-the-demolition-of-old-retaining-walls-during-the-renovation-of-an-old-river-channel\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.jzzmade.com\\\/wp-content\\\/uploads\\\/2026\\\/03\\\/IMG_20260226_115637-scaled.jpg\",\"articleSection\":[\"Knowledge\"],\"inLanguage\":\"fr-FR\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/www.jzzmade.com\\\/key-technical-points-for-installing-pvc-coated-steel-sheet-piles-following-the-demolition-of-old-retaining-walls-during-the-renovation-of-an-old-river-channel\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.jzzmade.com\\\/key-technical-points-for-installing-pvc-coated-steel-sheet-piles-following-the-demolition-of-old-retaining-walls-during-the-renovation-of-an-old-river-channel\\\/\",\"url\":\"https:\\\/\\\/www.jzzmade.com\\\/key-technical-points-for-installing-pvc-coated-steel-sheet-piles-following-the-demolition-of-old-retaining-walls-during-the-renovation-of-an-old-river-channel\\\/\",\"name\":\"Key Technical Points for Installing PVC-Coated Steel Sheet Piles Following the Demolition of Old Retaining Walls During the Renovation of an Old River Channel - shandong Jzz Made Co.\uff0cLtd.\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.jzzmade.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.jzzmade.com\\\/key-technical-points-for-installing-pvc-coated-steel-sheet-piles-following-the-demolition-of-old-retaining-walls-during-the-renovation-of-an-old-river-channel\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.jzzmade.com\\\/key-technical-points-for-installing-pvc-coated-steel-sheet-piles-following-the-demolition-of-old-retaining-walls-during-the-renovation-of-an-old-river-channel\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.jzzmade.com\\\/wp-content\\\/uploads\\\/2026\\\/03\\\/IMG_20260226_115637-scaled.jpg\",\"datePublished\":\"2026-08-08T08:24:00+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.jzzmade.com\\\/key-technical-points-for-installing-pvc-coated-steel-sheet-piles-following-the-demolition-of-old-retaining-walls-during-the-renovation-of-an-old-river-channel\\\/#breadcrumb\"},\"inLanguage\":\"fr-FR\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.jzzmade.com\\\/key-technical-points-for-installing-pvc-coated-steel-sheet-piles-following-the-demolition-of-old-retaining-walls-during-the-renovation-of-an-old-river-channel\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\\\/\\\/www.jzzmade.com\\\/key-technical-points-for-installing-pvc-coated-steel-sheet-piles-following-the-demolition-of-old-retaining-walls-during-the-renovation-of-an-old-river-channel\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.jzzmade.com\\\/wp-content\\\/uploads\\\/2026\\\/03\\\/IMG_20260226_115637-scaled.jpg\",\"contentUrl\":\"https:\\\/\\\/www.jzzmade.com\\\/wp-content\\\/uploads\\\/2026\\\/03\\\/IMG_20260226_115637-scaled.jpg\",\"width\":1920,\"height\":2560,\"caption\":\"_cuva\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.jzzmade.com\\\/key-technical-points-for-installing-pvc-coated-steel-sheet-piles-following-the-demolition-of-old-retaining-walls-during-the-renovation-of-an-old-river-channel\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.jzzmade.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Key Technical Points for Installing PVC-Coated Steel Sheet Piles Following the Demolition of Old Retaining Walls During the Renovation of an Old River Channel\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.jzzmade.com\\\/#website\",\"url\":\"https:\\\/\\\/www.jzzmade.com\\\/\",\"name\":\"shandong Jzz Made Co.\uff0cLtd.\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.jzzmade.com\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.jzzmade.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"fr-FR\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.jzzmade.com\\\/#organization\",\"name\":\"shandong Jzz Made Co.\uff0cLtd.\",\"url\":\"https:\\\/\\\/www.jzzmade.com\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\\\/\\\/www.jzzmade.com\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.jzzmade.com\\\/wp-content\\\/uploads\\\/2025\\\/11\\\/logo.png\",\"contentUrl\":\"https:\\\/\\\/www.jzzmade.com\\\/wp-content\\\/uploads\\\/2025\\\/11\\\/logo.png\",\"width\":180,\"height\":58,\"caption\":\"shandong Jzz Made Co.\uff0cLtd.\"},\"image\":{\"@id\":\"https:\\\/\\\/www.jzzmade.com\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.jzzmade.com\\\/#\\\/schema\\\/person\\\/d7e54f66316f62ccf41d02c644cf31c1\",\"name\":\"admin\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/1ff80d7d54635bb921c8b13df2a88c6e177bccf83fa9815398b8fea77880bae6?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/1ff80d7d54635bb921c8b13df2a88c6e177bccf83fa9815398b8fea77880bae6?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/1ff80d7d54635bb921c8b13df2a88c6e177bccf83fa9815398b8fea77880bae6?s=96&d=mm&r=g\",\"caption\":\"admin\"},\"sameAs\":[\"https:\\\/\\\/www.jzzmade.com\"],\"url\":\"https:\\\/\\\/www.jzzmade.com\\\/fr\\\/author\\\/admin\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Key Technical Points for Installing PVC-Coated Steel Sheet Piles Following the Demolition of Old Retaining Walls During the Renovation of an Old River Channel - shandong Jzz Made Co.\uff0cLtd.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.jzzmade.com\/fr\/key-technical-points-for-installing-pvc-coated-steel-sheet-piles-following-the-demolition-of-old-retaining-walls-during-the-renovation-of-an-old-river-channel\/","og_locale":"fr_FR","og_type":"article","og_title":"Key Technical Points for Installing PVC-Coated Steel Sheet Piles Following the Demolition of Old Retaining Walls During the Renovation of an Old River Channel - shandong Jzz Made Co.\uff0cLtd.","og_description":"After the demolition of old riverbank revetments during the renovation of historic river channels, the sites generally exhibit issues such as significant soil disturbance, thick layers of silt, residual construction debris, and frequent water level fluctuations. These conditions can easily lead to problems such as displacement of plastic-steel sheet piles, poor interlocking, subsequent seepage, and [&hellip;]","og_url":"https:\/\/www.jzzmade.com\/fr\/key-technical-points-for-installing-pvc-coated-steel-sheet-piles-following-the-demolition-of-old-retaining-walls-during-the-renovation-of-an-old-river-channel\/","og_site_name":"shandong Jzz Made Co.\uff0cLtd.","article_published_time":"2026-08-08T08:24:00+00:00","og_image":[{"width":1920,"height":2560,"url":"https:\/\/www.jzzmade.com\/wp-content\/uploads\/2026\/03\/IMG_20260226_115637-scaled.jpg","type":"image\/jpeg"}],"author":"admin","twitter_card":"summary_large_image","twitter_misc":{"\u00c9crit par":"admin","Dur\u00e9e de lecture estim\u00e9e":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.jzzmade.com\/key-technical-points-for-installing-pvc-coated-steel-sheet-piles-following-the-demolition-of-old-retaining-walls-during-the-renovation-of-an-old-river-channel\/#article","isPartOf":{"@id":"https:\/\/www.jzzmade.com\/key-technical-points-for-installing-pvc-coated-steel-sheet-piles-following-the-demolition-of-old-retaining-walls-during-the-renovation-of-an-old-river-channel\/"},"author":{"name":"admin","@id":"https:\/\/www.jzzmade.com\/#\/schema\/person\/d7e54f66316f62ccf41d02c644cf31c1"},"headline":"Key Technical Points for Installing PVC-Coated Steel Sheet Piles Following the Demolition of Old Retaining Walls During the Renovation of an Old River Channel","datePublished":"2026-08-08T08:24:00+00:00","mainEntityOfPage":{"@id":"https:\/\/www.jzzmade.com\/key-technical-points-for-installing-pvc-coated-steel-sheet-piles-following-the-demolition-of-old-retaining-walls-during-the-renovation-of-an-old-river-channel\/"},"wordCount":245,"commentCount":0,"publisher":{"@id":"https:\/\/www.jzzmade.com\/#organization"},"image":{"@id":"https:\/\/www.jzzmade.com\/key-technical-points-for-installing-pvc-coated-steel-sheet-piles-following-the-demolition-of-old-retaining-walls-during-the-renovation-of-an-old-river-channel\/#primaryimage"},"thumbnailUrl":"https:\/\/www.jzzmade.com\/wp-content\/uploads\/2026\/03\/IMG_20260226_115637-scaled.jpg","articleSection":["Knowledge"],"inLanguage":"fr-FR","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.jzzmade.com\/key-technical-points-for-installing-pvc-coated-steel-sheet-piles-following-the-demolition-of-old-retaining-walls-during-the-renovation-of-an-old-river-channel\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.jzzmade.com\/key-technical-points-for-installing-pvc-coated-steel-sheet-piles-following-the-demolition-of-old-retaining-walls-during-the-renovation-of-an-old-river-channel\/","url":"https:\/\/www.jzzmade.com\/key-technical-points-for-installing-pvc-coated-steel-sheet-piles-following-the-demolition-of-old-retaining-walls-during-the-renovation-of-an-old-river-channel\/","name":"Key Technical Points for Installing PVC-Coated Steel Sheet Piles Following the Demolition of Old Retaining Walls During the Renovation of an Old River Channel - shandong Jzz Made Co.\uff0cLtd.","isPartOf":{"@id":"https:\/\/www.jzzmade.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.jzzmade.com\/key-technical-points-for-installing-pvc-coated-steel-sheet-piles-following-the-demolition-of-old-retaining-walls-during-the-renovation-of-an-old-river-channel\/#primaryimage"},"image":{"@id":"https:\/\/www.jzzmade.com\/key-technical-points-for-installing-pvc-coated-steel-sheet-piles-following-the-demolition-of-old-retaining-walls-during-the-renovation-of-an-old-river-channel\/#primaryimage"},"thumbnailUrl":"https:\/\/www.jzzmade.com\/wp-content\/uploads\/2026\/03\/IMG_20260226_115637-scaled.jpg","datePublished":"2026-08-08T08:24:00+00:00","breadcrumb":{"@id":"https:\/\/www.jzzmade.com\/key-technical-points-for-installing-pvc-coated-steel-sheet-piles-following-the-demolition-of-old-retaining-walls-during-the-renovation-of-an-old-river-channel\/#breadcrumb"},"inLanguage":"fr-FR","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.jzzmade.com\/key-technical-points-for-installing-pvc-coated-steel-sheet-piles-following-the-demolition-of-old-retaining-walls-during-the-renovation-of-an-old-river-channel\/"]}]},{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/www.jzzmade.com\/key-technical-points-for-installing-pvc-coated-steel-sheet-piles-following-the-demolition-of-old-retaining-walls-during-the-renovation-of-an-old-river-channel\/#primaryimage","url":"https:\/\/www.jzzmade.com\/wp-content\/uploads\/2026\/03\/IMG_20260226_115637-scaled.jpg","contentUrl":"https:\/\/www.jzzmade.com\/wp-content\/uploads\/2026\/03\/IMG_20260226_115637-scaled.jpg","width":1920,"height":2560,"caption":"_cuva"},{"@type":"BreadcrumbList","@id":"https:\/\/www.jzzmade.com\/key-technical-points-for-installing-pvc-coated-steel-sheet-piles-following-the-demolition-of-old-retaining-walls-during-the-renovation-of-an-old-river-channel\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.jzzmade.com\/"},{"@type":"ListItem","position":2,"name":"Key Technical Points for Installing PVC-Coated Steel Sheet Piles Following the Demolition of Old Retaining Walls During the Renovation of an Old River Channel"}]},{"@type":"WebSite","@id":"https:\/\/www.jzzmade.com\/#website","url":"https:\/\/www.jzzmade.com\/","name":"shandong Jzz Made Co.\uff0cLtd.","description":"","publisher":{"@id":"https:\/\/www.jzzmade.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.jzzmade.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"fr-FR"},{"@type":"Organization","@id":"https:\/\/www.jzzmade.com\/#organization","name":"shandong Jzz Made Co.\uff0cLtd.","url":"https:\/\/www.jzzmade.com\/","logo":{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/www.jzzmade.com\/#\/schema\/logo\/image\/","url":"https:\/\/www.jzzmade.com\/wp-content\/uploads\/2025\/11\/logo.png","contentUrl":"https:\/\/www.jzzmade.com\/wp-content\/uploads\/2025\/11\/logo.png","width":180,"height":58,"caption":"shandong Jzz Made Co.\uff0cLtd."},"image":{"@id":"https:\/\/www.jzzmade.com\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.jzzmade.com\/#\/schema\/person\/d7e54f66316f62ccf41d02c644cf31c1","name":"l'administration","image":{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/secure.gravatar.com\/avatar\/1ff80d7d54635bb921c8b13df2a88c6e177bccf83fa9815398b8fea77880bae6?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/1ff80d7d54635bb921c8b13df2a88c6e177bccf83fa9815398b8fea77880bae6?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/1ff80d7d54635bb921c8b13df2a88c6e177bccf83fa9815398b8fea77880bae6?s=96&d=mm&r=g","caption":"admin"},"sameAs":["https:\/\/www.jzzmade.com"],"url":"https:\/\/www.jzzmade.com\/fr\/author\/admin\/"}]}},"_links":{"self":[{"href":"https:\/\/www.jzzmade.com\/fr\/wp-json\/wp\/v2\/posts\/2067","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.jzzmade.com\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.jzzmade.com\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.jzzmade.com\/fr\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.jzzmade.com\/fr\/wp-json\/wp\/v2\/comments?post=2067"}],"version-history":[{"count":1,"href":"https:\/\/www.jzzmade.com\/fr\/wp-json\/wp\/v2\/posts\/2067\/revisions"}],"predecessor-version":[{"id":2068,"href":"https:\/\/www.jzzmade.com\/fr\/wp-json\/wp\/v2\/posts\/2067\/revisions\/2068"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.jzzmade.com\/fr\/wp-json\/wp\/v2\/media\/1869"}],"wp:attachment":[{"href":"https:\/\/www.jzzmade.com\/fr\/wp-json\/wp\/v2\/media?parent=2067"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.jzzmade.com\/fr\/wp-json\/wp\/v2\/categories?post=2067"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.jzzmade.com\/fr\/wp-json\/wp\/v2\/tags?post=2067"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}